Ardmac
  • About Us
    • About Us
    • Safety First
    • Management
    • How We Work
    • ESG
      • Cycle for Hope
      • SkyBlue Programme
    • R&D & Innovation
    • CPD Training
  • What We Do
    • Data Centres Solutions
      • Data Centre Solutions
      • Modular Data Centre Solutions
      • Hot and Cold Aisle Solutions
      • Off Site Manufacturing
    • Life Sciences
      • Life Science Cleanrooms
      • Healthcare Solutions
      • Off Site Manufacturing
    • EV Battery Facilities
    • Microelectronics
    • Aerospace
    • Defence
    • Nuclear
    • Industrial & Commercial
      • Fit Outs
      • Refurbishment
  • Projects
  • Careers
    • Working with Ardmac
    • Open Positions
    • Student Hub
    • Learning Pathways
    • Women in Construction
  • Insights
  • Contact
Select Page

Modular Construction : Hillerød, Denmark.

Design, build, and supply of a prefabricated tank farm building for Europe’s largest cell culture CDMO

Client: Confidential

Location: Hillerød, Denmark.

Project Size: 36.855 m2.

Duration: Confidential

Ardmac were tasked with the design, build, and supply of a prefabricated tank farm building for Europe’s largest cell culture CDMO, located in Hillerød, Denmark.  

The project involved the installation of a single-storey building with two rooms; wet side & electrical side, covering a total area of 36.855 m2. 

Our clients work at the forefront of innovation. We design OSM (Off-Site Manufacturing) solutions to be flexible, scalable and repurposed on a portable platform, allowing for transportation to another facility/location should the need arise. 

Meeting The Client’s Requirements: 

There was a large team involved in different aspects of the build. Managing the Request for Information (RFI) and communication between the various teams required meticulous attention to detail and effective collaboration. Additionally, making key electrical decisions, such as the placement of Roxtec units, proved to be challenging but once resolved, the installation was completed swiftly.  

Ardmac maintained a well-managed program, with weekly reporting ensuring transparency and control over the project schedule. After overcoming any challenges and managing the project effectively, Ardmac successfully completed the construction of this modular project on schedule. The manufacturing of the project took just 26 days in total before being transported to Denmark from Longford.

The client expressed their satisfaction with Ardmac’s performance, highlighting our consistent delivery of high-quality products, proactive communication, and responsiveness to inquiries, which aided the effective planning and smooth workflows throughout the project. 

Client Testimonial – Fluor: 

“We are extremely satisfied with Ardmac’s performance as a supplier. Your dedication and consistent delivery of high-quality products on schedule have been crucial to this Project. Thank you for your responsiveness to our inquiries and proactive communication about potential delays or issues, which have helped us plan effectively and maintain smooth workflows. We look forward to working with you again in the future.” 

Overall, Ardmac’s successful completion of this modular construction project showcases expertise in construction, project management, and commitment to delivering high-quality results within specified timelines. 

“This project has been an exciting journey of collaboration and innovation. By embracing new ideas and technologies, we’ve not only met but exceeded our objectives. The outcome reflects the team’s hard work, adaptability, and commitment to excellence. It’s been a rewarding experience to be part of a project that will have a lasting impact for our client.”

David Higgins, Project Manager

Previous Case Study Next Case Study
  • About Us
  • Working with Ardmac
  • Case Studies
  • Insights
  • Contact
  • Manage Cookies Consent
Copyright 2022 Ardmac | All Rights Reserved | Website Maintenance by 2Cubed