Ardmac
  • About Us
    • About Us
    • Safety First
    • Management
    • How We Work
    • ESG
      • Cycle for Hope
      • SkyBlue Programme
    • R&D & Innovation
    • CPD Training
  • What We Do
    • Data Centres Solutions
      • Data Centre Solutions
      • Modular Data Centre Solutions
      • Hot and Cold Aisle Solutions
      • Off Site Manufacturing
    • Life Sciences
      • Life Science Cleanrooms
      • Healthcare Solutions
      • Off Site Manufacturing
    • EV Battery Facilities
    • Microelectronics
    • Aerospace
    • Defence
    • Nuclear
    • Industrial & Commercial
      • Fit Outs
      • Refurbishment
  • Projects
  • Careers
    • Working with Ardmac
    • Open Positions
    • Student Hub
    • Learning Pathways
    • Women in Construction
  • Insights
  • Contact
Select Page

Global Pharmaceutical Client

ISO 5, 6, 7 & 8 Cleanrooms

Client: Confidential

Location: Dublin

Project Size: 700 m2

Duration: 11 Months

europe flagirish flag

Ardmac were contracted to provide a new 700m2 ISO 5, 6, 7 & 8 Cleanrooms within the existing facility and adjacent to live operations for a global pharmaceutical client in Dublin. The scope of work included demolition of existing office space to create the footprint for the new cleanroom and as part of the new build we constructed a new plasterboard fire compartment including decoration and fire stopping. Within this new compartment we installed the cleanroom ceiling with a UDL of 2.5kn/m2.

The ceiling has a grid to facilitate cable management with interchangeable load bearing tile and facilitates dual construction above and below the ceiling, thus condensing the overall construction programme. We completed the ceiling installation with top access walk on lights and terminal HEPA housings. Following the ceiling installation, we installed the cleanroom partitions, doors, door automation, glazing including an ISO 5 fully filtered area with localised glass return airwalls. We also designed and constructed an ISO 7 (2oC-8oC) coldroom including duty and standby AHU, ducting and qualified BMS. On completion of the project we commissioned the new facility in accordance with site protocols and procedures.

Previous Case Study Next Case Study
  • About Us
  • Working with Ardmac
  • Case Studies
  • Insights
  • Contact
  • Manage Cookies Consent
Copyright 2022 Ardmac | All Rights Reserved | Website Maintenance by 2Cubed