Ardmac were contracted on a subcontract basis to deliver a new data hall in Medemblik, Netherlands. The Data Centre project involved 60,000 sq metres of data hall fit out including electrical support rooms, whitewall (45,000 sqm), Walk-on Ceilings (32,000 sqm), 132...
Ardmac were recently appointed to design and build both clean and dry production spaces on a major new giga factory in the North East of England. This includes HVAC design, structural dependencies for all in scope systems, all non-classified ancillary spaces/labs and...
Ardmac were entrusted with a Design Build Turnkey Package for a Quality Control Laboratory associated with a new API (Active Pharmaceutical Ingredient) facility in Ireland. In addition to this scope, Ardmac were awarded the Architectural envelope of the cleanroom...
Introduction Ardmac, a renowned specialist in constructing controlled environments, has successfully completed a full cleanroom installation for a leading global animal health company. This project, undertaken at their facility in Tullamore, Ireland, signifies a...
Ardmac were tasked with the design, build, and supply of a prefabricated tank farm building for Europe’s largest cell culture CDMO, located in Hillerød, Denmark. The project involved the installation of a single-storey building with two rooms; wet side &...
The Challenge The client, a chemical solutions provider collaborating with some of the world’s leading companies, required the construction of two DTX Cleanroom facilities that adhered to strict industry standards. The facilities needed to be designed, built, and...