Introduction Ardmac is trusted by leading pharmaceutical manufacturers for delivering complex projects in highly regulated environments. Our expertise in OSM, specialist fitout and structural installation was central to the successful upgrade of our client’s Ireland...
Ardmac were tasked with the design, build, and supply of a prefabricated tank farm building for Europe’s largest cell culture CDMO, located in Hillerød, Denmark. The project involved the installation of a single-storey building with two rooms; wet side &...
The Challenge The client, a chemical solutions provider collaborating with some of the world’s leading companies, required the construction of two DTX Cleanroom facilities that adhered to strict industry standards. The facilities needed to be designed, built, and...
This project involved the creation of a modular testing facility made up of six external modules. The client needed a rental option that could be quickly deployed. These units were installed on an existing site, adjacent to a current facility, and were designed to...
Germfree were contracted to deliver two modularised vaccine manufacturing suites for a multinational pharmaceutical client. The first project, situated in Germany, was completed in two phases as a proof of concept, achieving a Percentage Manufactured Value of 78% of...
Ardmac were contracted to provide a Design & Build Turnkey Cleanroom in an existing facility, consisting of approximately 3500 square meters of ISO 8 Cleanroom, non-classified White Room, fit out of offices, meeting rooms and staff facilities for one of our global...