Ardmac
  • About Us
    • About Us
    • Safety First
    • Management
    • How We Work
    • ESG
      • Cycle for Hope
      • SkyBlue Programme
    • R&D & Innovation
    • CPD Training
  • What We Do
    • Data Centres Solutions
      • Data Centre Solutions
      • Modular Data Centre Solutions
      • Hot and Cold Aisle Solutions
      • Off Site Manufacturing
    • Life Sciences
      • Life Science Cleanrooms
      • Healthcare Solutions
      • Off Site Manufacturing
    • EV Battery Facilities
    • Microelectronics
    • Aerospace
    • Defence
    • Nuclear
    • Industrial & Commercial
      • Fit Outs
      • Refurbishment
  • Projects
  • Careers
    • Working with Ardmac
    • Open Positions
    • Student Hub
    • Learning Pathways
    • Women in Construction
  • Insights
  • Contact
Select Page

Montrose Aparto

Client: Hines

Location: Dublin

Project Size: 78,600 sqft

Duration: 18 Months

europe flagirish flag

Montrose Aparto which was originally constructed as a hotel in 1960’s was converted into student apartments in 2014. Following a two-stage tender process, Ardmac were appointed to carry out complex structure and fire remediation works along with the full refurbishment of the five floors of student apartments.

The new stylish, modern student residence comprises of 206 apartments, 28 communal kitchens along with Reception, Study and Laundry rooms. The project consisted of the removal of plasterboard ceilings and sections of walls, removal of stud partitions and full strip out of all finishes. New stud partitions were constructed along with the installation of fire rated ceilings, encasement of beams and columns, installation of fire stopping and new dampners, installation of putty pads and intumescent pillows in trunking and alterations to the existing fire detection and emergency lighting systems.

The 5 floors were fitted out with new finishes, fixtures and furnishings along with upgrades to existing services to accommodate new ceilings and partitions.

Works were completed over busy live retail units, including Bank of Ireland, Spar, Insomnia and Subway. A Health & Safety Construction Stage Plan and Stakeholder Communication procedure were implemented and managed by the Ardmac Site Management Team. Works sequence including deliveries and waste removal were managed through programme meetings, Last Planner Sessions and Daily Whiteboard Meetings.

“Big congratulations and huge thanks for the almighty effort that you, the team and all supporting staff and trades have contributed over the last 18months. This has been a project like no-other and without your dedication and experience we simply would not be in a position to welcome students this coming academic year. Through each setback, the collaborative nature has enabled us to adapt and remain nimble and I would say sets the benchmark for projects going forward.”

Hugo Pywell, Hines

 

Previous Case Study Next Case Study
  • About Us
  • Working with Ardmac
  • Case Studies
  • Insights
  • Contact
  • Manage Cookies Consent
Copyright 2022 Ardmac | All Rights Reserved | Website Maintenance by 2Cubed