Global Pharmaceutical Client
ISO7 & 8 Cleanroom Facility
Client: Confidential
Location: Ringaskiddy, Co. Cork
Project Size: Approx. 3400m2
Duration: 17 Months
Ardmac were contracted to provide an ISO7 & 8 cleanroom facility for a global pharmaceutical client which included the design and installation of 2.5kn/m2 Modular Ceilings, aluminium honeycomb core flush cGMP partitions, the integration of double flush doors and glazing, door automation and the provision of a Pneumatically operated Atex interlocking door control system. The scope of responsibility also included the supply and installation of lights, terminal HEPA housings and stainless steel elements such as wall / floor protection and change area furniture.
For this project, Ardmac used the latest technologies such as BIM to generate a clash free model , LEAN processes to bring value to the client and the use of integrated scheduling coupled with strong Project Management. As a result, this complex project was handed over on time.