North East Giga Factory

North East Giga Factory

Ardmac were recently appointed to design and build both clean and dry production spaces on a major new giga factory in the North East of England. This includes HVAC design, structural dependencies for all in scope systems, all non-classified ancillary spaces/labs and...
API Project

API Project

Ardmac were entrusted with a Design Build Turnkey Package for a Quality Control Laboratory associated with a new API (Active Pharmaceutical Ingredient) facility in Ireland. In addition to this scope, Ardmac were awarded the Architectural envelope of the cleanroom...
Cleanroom Installation for a Global Animal Health Client

Cleanroom Installation for a Global Animal Health Client

Introduction Ardmac, a renowned specialist in constructing controlled environments, has successfully completed a full cleanroom installation for a leading global animal health company. This project, undertaken at their facility in Tullamore, Ireland, signifies a...
Modular Construction : Hillerød, Denmark.

Modular Construction : Hillerød, Denmark.

Ardmac were tasked with the design, build, and supply of a prefabricated tank farm building for Europe’s largest cell culture CDMO, located in Hillerød, Denmark.   The project involved the installation of a single-storey building with two rooms; wet side &...
DTX Cleanroom Facilities

DTX Cleanroom Facilities

The Challenge The client, a chemical solutions provider collaborating with some of the world’s leading companies, required the construction of two DTX Cleanroom facilities that adhered to strict industry standards. The facilities needed to be designed, built, and...
Blast Wall

Blast Wall

Blast Wall Solution: Ardmac were awarded the turnkey design build of the cleanroom facility including Blast Walls for an international pharmaceutical client in Ireland. A critical component of the API facility was its blast wall. Ardmac successfully designed and...