Global Pharmaceutical Company

Global Pharmaceutical Company

Ardmac provided architectural cleanroom package finishes for the project, which was procured as a performance envelope, consisting of circa 1,600m2 of  cleanroom manufacturing space and QC clean lab area. Ardmac’s responsibility included coordinating detailed design,...
Data Centre Project

Data Centre Project

Ardmac were contracted to provide the internal architectural trade package in the construction of a new 60 megawatt multi-phase Data Centre project in Odense in Denmark. Each phase included the construction 32MW buildings – each with 4 no. Data Halls – and an...
Penketh

Penketh

Ardmac completed the Cat B fit-out of Penketh Group’s new offices and showroom within the Neo Building, Manchester. The project has provided an exciting opportunity to showcase Penketh Group’s comprehensive range of products for workspace solutions, in their new 5,000...
63-66 Amiens Street – Foras na Gaeilge

63-66 Amiens Street – Foras na Gaeilge

Refurbishment of an existing 4-storey over single level basement office development at 63-66 Amiens Street, Dublin. The works consisted of major structural alterations in reception to bring the existing floor level down to street level, complete strip out of all...
Allergan Biologics

Allergan Biologics

Allergan pharmaceuticals develop medical aesthetics, and drugs for paediatric cerebral palsy, cervical dystonia, hyperhidrosis, and glaucoma. Allergan engaged with Ardmac to install high-quality cleanrooms in their facility in Westport, Co. Mayo, over an overall floor...
GSK Worthing

GSK Worthing

Ardmac were contracted to deliver the fit-out of ISO 5, 7, and 8 cleanroom facilities for the pharmaceutical company, GlaxoSmithKline at their facility in Worthing. We used lean construction methodologies throughout this project to gain a number of design...