Ardmac were contracted to provide the internal architectural trade package in the construction of a new 60+ megawatt, 25,000-square-metre multi-storey Data Centre near Mons, a Walloon city and municipality, and the capital of the Belgian province of Hainaut in Belgium.

The project schedule was 9 months and spanned 25,000m2 data centre space.

BIM was utilised during the design and construction phases to aid the coordination and installation processes, working with the client design team, general contractor and key trade contractors.

The interior architectural package included modular prefabricated partition panels, ceilings, doorsets, caging, and associated fire stopping.

Client: Confidential

Location: Mons, Belgium

Size: 25,000 m2

Duration: 9 months